Highlights of our team’s track record
We take special pride in our growing list of clients who’ve expressed satisfaction with our work. You may have admired some of the quality projects K-Van Construction has done for them.
When we’re awarded your structure or facility project, we’re confident that you’ll be equally satisfied… and that this list will grow even longer.
Buckeye Co op Shop – Buckeye, Iowa – 1996
Neely Farms – Iowa Falls, Iowa – Several Projects
Pepsi-Cola Bottling Co. – Marshalltown, Iowa – 1998
Heartland Pork, Int. – Alden, Iowa – 1995
Mason City Airport – Clear Lake, Iowa – 1996
Winnebago Industries – Forest City, Iowa – Several Projects
3M – Ames, Iowa – Recreation Facility
Newell Family Partnership – Ames, Iowa – 1997
Iowa Northern Railway – Greene, Iowa – 1989
A.C.I. Mechanical, L.C. – Ames, Iowa – 1997
Ellsworth Municipal Hospital – Iowa Falls, Iowa – 1995
Warranty Protection
Lester’s design and manufacturing standards are based on the objective of delivering buildings that, when erected according to Lester specifications by Lester builders like us, result in unparalleled peace of mind. In other words, Lester’s buildings design and structure integrity should instill total confidence in our customers!
On the other hand, Lester buildings are designed to be “right the first time,” and provide unrivaled, long-term performance. That’s why Lester’s warranty is straightforward – firmly supported by unequaled engineering know-how.
LIMITED WARRANTY
Roof and side paneling paint chalk and fade: 30 years
Paint cracking, checking and red rust protection: 40 years
Snow load damage: Lifetime for loads not exceeding design requirements
Wind load damage: Lifetime for loads not exceeding design requirements
Preservative treated wood: 50 years on treated columns